PdM Platform The Toolbox Services Academy Library About Contact Pricing

News ·

Research Council of Norway approves Bluestream's remaining-useful-life R&D project under SkatteFUNN

All six work packages were approved without change. The three-year project tests one idea: start from industry reliability data (OREDA / ISO 14224), update it with data from the sensors a plant already has, and get a calibrated, explainable estimate of remaining useful life for a machine that has never failed.

R&D Tax Credit PdM Platform SkatteFUNN Forskningsrådet · Norway
Prior-to-posterior estimate of remaining useful life An observed condition trace runs up to now and declines toward a dashed functional-failure threshold. From now, a wide band shows the population prior from OREDA and ISO 14224 reliability data. A narrower band inside it shows this unit's posterior, P10 to P90 (earliest to latest), after updating on its own sensor data. Remaining useful life is the distance from now to where the posterior median meets the threshold. Illustrative shapes, not measured data. FUNCTIONAL FAILURE PRIOR · OREDA / ISO 14224 UNIT POSTERIOR P10–P90 REMAINING USEFUL LIFE NOW OBSERVED CONDITION
Population prior, OREDA / ISO 14224 Unit posterior, P10 to P90 (earliest to latest) Functional-failure threshold Observed condition, up to now The hypothesis, drawn. Illustrative shapes, not measured data. Making the narrow band calibrated is the job of work package 1 (WP1).

On September 17th, 2026, Forskningsrådet (the Research Council of Norway) approved Bluestream AS's application under SkatteFUNN, Norway's tax-incentive scheme for research and development. The project is titled Standards-grounded, explainable remaining-useful-life prediction from industrial sensors. It runs for three years, and the approval covers all of it: January 2026 to December 2028.

At a glance

Approved ·

Estimated tax credit, 2026 to 2028. 19% of NOK 3,150,000 in budgeted R&D cost.
NOK598,500
R&D criteria met
3 of 3
work packages approved, category unchanged
6 of 6
Jan 2026 to Dec 2028, as applied for
36months
Project owner
Bluestream AS
Assessed by
Forskningsrådet · SkatteFUNN
Category
Experimental development
Settled as
Credit against assessed tax, excess paid out as cash
Application no.
50174055
Legal basis
Tax Act (skatteloven) § 16-40, with the SkatteFUNN regulation

An estimate from the budget in the approved application, not an award. What decides the final amount is set out under How a 19% tax credit becomes cash.

Three criteria, six work packages, no changes

SkatteFUNN approval is not automatic. A case officer at Forskningsrådet assesses every application against three criteria and the project period, and the decision letter records a verdict on each:

  • Criterion 1New goods, services or production processesApproved
  • Criterion 2New knowledge or new skillsApproved
  • Criterion 3Targeted and delimitedApproved
  • Project periodJan 1st, 2026 to Dec 31st, 2028, as applied forApproved
From the decision letter

The letter then gives two categories for each work package: the one the applicant chose and the one the case officer assigned. One of the categories open to the case officer is “not R&D, ordinary product development”. All six packages were submitted as experimental development, the case officer's column reads “not changed” for each, and all six were approved.

The cold-start problem: a machine that has never failed

The scientific problem at the centre of the project is the cold start: how to give a calibrated estimate of remaining useful life (RUL), one whose stated 80% interval contains the actual failure about 80 times in 100, for one specific machine when there is little or no failure history for that machine. Data-driven platforms answer it with a long learning period per asset and a black-box output. Traditional reliability tools hold the standardised data, but use it offline and do not connect it to live sensors.

The hypothesis is that the two can be joined, as drawn at the top of this page. Standardised reliability data (OREDA failure data, organised by the ISO 14224 taxonomy) serves as the population prior: what is known about machines of this class before this one has been observed. Live data from the plant's own heterogeneous, non-proprietary sensors then updates that prior into a posterior for the unit: an RUL with an uncertainty band, per maintainable item, with the failure mode named.

None of this is established. It is not known whether the combined estimate stays statistically calibrated when failures are rare and the data right-censored, or whether degradation seen in shared signals can be assigned to the right maintainable item. The application states that the outcome is uncertain at the start, which is what makes it research and development.

Six work packages, each with a stated test

Each work package takes one open question and states how the answer will be judged. Five name a pass criterion; WP5 delivers a measured trade-off curve instead. The application fixes the pass marks, not the number of cases behind them.

When each package runs

Application + decision letter

January 2026 to December 2028, by month. Every package has months in 2027, the budget's peak year. At most five run at once. The vertical line marks the approval date.

  1. WP1Prior and evidence fusionJan 2026 to Aug 2027
  2. WP2AttributionMay 2026 to Aug 2028
  3. WP3Comparable health indicatorsMay 2026 to Oct 2027
  4. WP4Faithful explainabilityApr 2027 to Dec 2028
  5. WP5Inference at the edgeOct 2027 to Dec 2028
  6. WP6Field validationApr 2027 to Dec 2028
  7. Status reportsby Mar 1st, 2027 and Mar 1st, 2028

Approved Sept 17th, 2026. Months to the left of this line predate the decision and fall inside the approved period.

Start and end months exactly as in the approved application. Diamonds mark the annual status reports; the approval date and the report dates come from the decision letter.
  1. WP1

    Prior and evidence fusion

    Jan 2026 to Aug 2027 · 20 months

    A Bayesian model that starts from the OREDA prior and updates it with condition data into an RUL posterior with uncertainty bands. Calibration is tested on right-censored runs: observed failures should fall inside the predicted interval as often as the stated confidence level says.

    TargetBeats 2 baselinesthe prior alone and a naive threshold alarm, with calibrated intervals, on at least 2 equipment classes
  2. WP2

    Attribution

    May 2026 to Aug 2028 · 28 months

    A motor and its pump share vibration, temperature and current signals. The method decomposes the shared signals and assigns degradation to the right maintainable item and ISO 14224 failure mode, with seeded faults as the answer key.

    Target≥ 80%of seeded, known-answer cases attributed to the correct item and failure mode, on at least 2 unit types
  3. WP3

    Comparable health indicators

    May 2026 to Oct 2027 · 18 months

    Low-cost sensors differ in type, sampling rate, placement and protocol (OPC UA, Modbus, MQTT, I²C), so their raw signals are not comparable. The work is feature extraction that yields comparable health indicators regardless of setup.

    TargetWithin 10%agreement between two different sensor setups on the same unit
  4. WP4

    Faithful explainability

    Apr 2027 to Dec 2028 · 21 months

    Explanations derived from the model's actual inference instead of rationalised afterwards, expressed in ISO 14224 vocabulary and as a position on the P–F curve. The application calls this unsolved in the explainability literature.

    Target≥ 85%of a reviewed set of cases accepted as technically correct by one or more reliability engineers
  5. WP5

    Inference at the edge

    Oct 2027 to Dec 2028 · 15 months

    Accuracy, latency and energy measured on constrained edge hardware against an unconstrained reference, under intermittent connectivity.

    OutputA trade-off curveNo pass mark: the trade-off is not known in advance, so the deliverable is a quantified curve showing where fidelity holds
  6. WP6

    Field validation

    Apr 2027 to Dec 2028 · 21 months

    Experiments with induced and accelerated degradation to create ground truth, then the whole method on live data from real industrial equipment, scored with statistics for right-censored data.

    Target≥ 2 siteswith a map of where the method fails as well as where it succeeds

The method is tested on three equipment classes chosen to differ in failure physics and in sensor type, so a result on one cannot be assumed for the others:

Mechanical wear

Rotating equipment

Test object
Motor and pump
Sensed via
Vibration and motor current
Fouling

Heat-transfer equipment

Test object
Cooling process
Sensed via
Temperature, flow and pressure drop
Electrical and thermal

Electrical equipment

Test object
Motor windings and switchboards
Sensed via
Temperature and three-phase current

Where the work stands

WP1 started in January 2026: a first prior-to-posterior RUL estimator is wired into the platform, and a separate calibration harness scores it against simulated run-to-failure data with known answers. WP2 and WP3 followed in May 2026. For WP3, a Raspberry Pi edge gateway now carries data from a first low-cost sensor to the platform.

WP4 and WP6 start in April 2027, WP5 in October 2027. Field validation is planned with U.S. company Optec, LLC under a non-binding Letter of Intent.

How a 19% tax credit becomes cash

SkatteFUNN is a rights-based scheme: once a project is approved, the company is entitled to claim a tax credit of 19% of the eligible, documented R&D cost in the project, within a ceiling of NOK 25 million in project cost per company per income year.

The approved application budgets NOK 3,150,000 of R&D cost over the three years, all of it personnel and indirect cost. At 19% the estimated credit is NOK 598,500:

The 19% that comes back, drawn to scale

From the application
Income yearBudgeted R&D costEstimated credit, 19%Settled in
2026945,000179,5502027
20271,225,000232,7502028
2028980,000186,2002029
Total3,150,000598,500
All amounts NOK. These are budget figures: the credit follows the actual, documented cost in each year, so it moves up or down with the work done. The settlement years follow from the tax calendar, not from the application.

For an early-stage company the question is what happens when there is little or no tax to set the credit against. The Tax Act settles it: if the credit exceeds the company's assessed tax, the excess is paid out in the tax settlement (skatteloven § 16-40, sixth paragraph). Skatteetaten, the Norwegian Tax Administration, makes that payment. For a company with no tax payable, the whole credit therefore arrives as cash, in the year after the cost was incurred.

Bluestream is building the PdM platform without outside equity. A 19% credit on eligible cost lowers the net cost of three years of R&D by up to 19%, and by less wherever real cost exceeds the capped hourly rate. It can be combined, within the state-aid ceiling, with the other non-dilutive funding the company is pursuing in Norway and the EU.

What the approval is, and is not

It is a reimbursement, not an advance.
Bluestream carries the R&D cost first. The credit is claimed on each year's corporate tax return and settled the following year. Because the approved period starts on January 1st, 2026, eligible cost from that date can go into the 2026 claim, provided the hours were logged as they were worked.
Combined public support is capped.
SkatteFUNN can be combined with other public support for the same project, but state-aid rules set a maximum for the total. If the sum exceeds it, the SkatteFUNN credit is reduced in the tax settlement.
It assumes a company not in financial difficulty.
The approval presupposes that Bluestream AS was not an undertaking in difficulty, in the state-aid sense, on the decision date.
It is tied to this plan and this calendar.
The project cannot be extended past December 31st, 2028. If its goals or work packages change materially, it has to be closed with a final report and applied for again.
Only documented cost counts.
The whole budget is personnel and indirect cost, so the claim is built from timesheets: hours per person, per day, per work package. The hourly rate is set by regulation at 1.2 per mille (0.12%) of annual salary, with a maximum of NOK 700 per hour, and at most 1,850 hours per person per year count. An auditor has to attest the cost. Skatteetaten decides how the basis is calculated and can audit the claim.
It comes with reporting.
A status report by March 1st each year, a final report no later than March 1st, 2029, and a follow-up report no later than two years after the project ends. If a report is missed, Forskningsrådet notifies Skatteetaten and can withdraw the approval (SkatteFUNN regulation § 16-40-10).

“The money matters for the research ahead. What matters more is that with this approval Forskningsrådet recognises our research and development as innovative and of industrial value.”

Andreas Skaanes Hulsund · General Manager & CEO, Bluestream

The research questions are the product's claims

The credit is the part with a number on it. The other part is what the project commits Bluestream to. The research questions sit under the claims the platform makes to customers: that an RUL interval can be calibrated rather than guessed, that a prediction can be traced to a named failure mode on a named maintainable item, and that none of it depends on one sensor vendor. The platform has a first version of each today: an RUL estimate with a P10 to P90 band (P10 is the earliest edge, the reverse of the reserves-reporting convention), a failure-mode label on the alert and the work order, and ingest over open protocols. Whether they hold on real equipment, and how well, is not established.

Forskningsrådet's approval is narrower than an endorsement. It means a case officer accepted three things: that the project aims at something new, that it has to produce new knowledge to get there, and that it is targeted and delimited. It says nothing about whether the method will work, and it is not a review of the product.

The tests written into each work package are how Bluestream, and its customers, will find out.

About Forskningsrådet and SkatteFUNN

Forskningsrådet (opens in a new tab), the Research Council of Norway, is the national body that funds and advises on research and innovation. It assesses every SkatteFUNN application on its R&D content, while Skatteetaten handles the tax credit itself. SkatteFUNN is open to companies of every size and sector that are liable to tax in Norway. A company does not have to be paying tax yet, which is why the scheme works for a pre-profit company. Forskningsrådet publishes a summary of every approved project in its project bank, Prosjektbanken. Learn more at forskningsradet.no/skattefunn (opens in a new tab).

Forskningsrådet, the Research Council of Norway (opens in a new tab)

About the Bluestream PdM platform

The Bluestream PdM platform is built to use the sensors a plant already has to predict the remaining useful life of industrial equipment, explain why a failure is developing (the ISO 14224 failure mode and the position on the P–F curve), and generate a failure-mode-labelled work order in the customer's own maintenance system. Read more on the PdM platform page or in the PdM platform roadmap.

Approved by Forskningsrådet, the Research Council of Norway, as an R&D project under SkatteFUNN, Norway's R&D tax-incentive scheme, application no. 50174055. Norwegian project title: Standardforankret, forklarbar prediksjon av gjenværende levetid fra industrielle sensordata.